10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.
Maintenance compares two AMRs at two compatible charging stations. Both robots dock successfully at either station. At Station East, both report zero charging current; at Station West, both charge normally. Their batteries are below the charge target, within the permitted temperature range, and free of protection faults. Where should the next diagnostic check be directed?
Show answer & explanation
Correct answer: C - The power supply and charging-enable status at Station East.
Question 2
An AMR may begin pickup at either of two loading stations. Pickup requires an empty carrier and no transfer fault, regardless of which station is used. AtA and AtB indicate confirmed docking at the respective stations; Empty indicates an empty carrier; Fault indicates an active transfer fault. A value of 1 means the named condition is true. Select the expression that implements this process permission.
Show answer & explanation
Correct answer: A - (AtA OR AtB) AND Empty AND NOT Fault
Question 3
During docking acceptance, an AMR is measured 3 mm east and 4 mm north of its target, with a heading error of 2 degrees. The station permits a straight-line position error of no more than 6 mm and a heading error of no more than 3 degrees; both limits must be met. All other transfer permissives are satisfied. Which entry belongs in the acceptance record?
Show answer & explanation
Correct answer: B - Position error 5 mm; heading error 2 degrees; transfer is permitted.
Question 4
Releasing the hold-to-run control is supposed to stop an AMR during manual operation. The operator releases it, but the robot keeps moving toward a worker between the load and a fixed machine. A designated emergency-stop button is immediately accessible without entering the travel path. The operator should first:
Show answer & explanation
Correct answer: B - Activate the emergency stop and warn the worker to move clear.
Question 5
An idle AMR has 36% state of charge (SOC) and is not in a charging cycle. Dispatch requires at least 25% SOC at departure and at least 15% after the delivery and return to a charger. Job A is estimated to consume 12 percentage points for delivery and another 12 for the charger return. Job B requires 9 and 8 percentage points, respectively. All other readiness checks pass. Which job assignment is allowed by both SOC limits?
Show answer & explanation
Correct answer: D - Job B only; estimated SOC after delivery and charger return is 19%.
Question 6
A commissioning engineer changes a delivery destination in mission revision 8. The transfer to the correct AMR succeeds, and the controller lists revision 8 in its stored missions. Its execution page still identifies revision 7 as active. This controller separates file transfer from mission activation. The robot is parked, its queue is empty, and the change is approved. What remains to be done before testing the revised destination?
Show answer & explanation
Correct answer: A - Activate revision 8 on the AMR and verify its active revision.
Question 7
A plant accepts an AMR wireless route only when received signal strength is at least -65 dBm, signal-to-noise ratio is at least 25 dB, packet loss is no more than 1%, and maximum round-trip time is no more than 50 ms. At the loading bay, measurements are -58 dBm signal, -75 dBm noise, 0.4% packet loss, and 32 ms maximum round-trip time. How should this location be classified?
Show answer & explanation
Correct answer: C - Unacceptable: the 17 dB signal-to-noise ratio falls below the required minimum.
Question 8
A station uses an AMR TransferRequest output and a Done input that stays high until the completion handshake is cleared. A trace shows Done = 1 before a new request. TransferRequest then changes from 0 to 1 and remains high. Done never changes, yet the mission immediately advances past its completion check. The carrier is still empty, and the timeout has not expired. How should the completion check be revised?
Show answer & explanation
Correct answer: D - Require Done = 0 before requesting transfer and a new 0-to-1 transition afterward.
Question 9
An AMR makes a protective stop when a pallet enters its scanner field. The pallet is removed without anyone entering a pinch point. The operator verifies a clear travel envelope, an undisturbed load, valid localization, and no remaining fault. The installation requires an operator Resume command after this kind of stop. A colleague recommends taking the robot out of service because the scanner interrupted production. Which response is warranted?
Show answer & explanation
Correct answer: C - Use the approved Resume command after confirming the pending mission action.
Question 10
A temporary pallet blocks the preferred route to a delivery point. The AMR remains correctly localized. Its active map offers a longer, clear route approved for the current load through a 0.4 m/s speed zone. A shorter alternative crosses a keep-out zone. The mission permits replanning, and the robot has adequate energy for the longer route. Choose the appropriate navigation response.
Show answer & explanation
Correct answer: A - Use the longer permitted route while observing its 0.4 m/s speed limit.